Vis enkel innførsel

dc.contributor.authorStatens vegvesen
dc.contributor.authorJOM/KNHBE/JOH
dc.coverage.spatialNorway, E39 Bjørnafjordenen_US
dc.date.accessioned2020-07-02T07:34:24Z
dc.date.available2020-07-02T07:34:24Z
dc.date.issued2019-08-15
dc.identifier.urihttps://hdl.handle.net/11250/2660411
dc.description.abstractThis report describes the geotechnical design for the recommended bridge concept K12. The K12 concept is an end-anchored floating bridge with mooring system for increased robustness and redundancy. There is a pylon support at Svarvhelleholmen in south, and a filling at Gullholmane in the north. Mooring pontoons are at two locations, with 4 anchors in each direction, which gives 16 anchor locations in total.en_US
dc.description.sponsorshipStatens vegvesen Vegdirektorateten_US
dc.language.isoengen_US
dc.publisherStatens vegvesenen_US
dc.relation.ispartofseriesStatens vegvesens rapporter;
dc.rightsAttribution-NoDerivatives 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by-nd/4.0/deed.no*
dc.subjectSBJ-33-C5-OON-22-RE-022en_US
dc.subjectE39 Bjørnafjordenen_US
dc.subjectStatens vegvesen Vegdirektorateten_US
dc.titleK12 – Marine geotechnical designen_US
dc.typeReporten_US
dc.source.pagenumber90en_US


Tilhørende fil(er)

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Attribution-NoDerivatives 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Attribution-NoDerivatives 4.0 Internasjonal