K12 – Marine geotechnical design
Abstract
This report describes the geotechnical design for the recommended bridge concept K12. The K12 concept is an end-anchored floating bridge with mooring system for increased robustness and redundancy. There is a pylon support at Svarvhelleholmen in south, and a filling at Gullholmane in the north. Mooring pontoons are at two locations, with 4 anchors in each direction, which gives 16 anchor locations in total.