Blar i Statens vegvesens rapporter / NPRA reports på emneord "SBJ-33-C5-AMC-28-RE-114"
Viser treff 1-1 av 1
-
Preferred solution, K12 – Appendix N - Construction and marine operations
(Statens vegvesens rapporter;, Report, 2019-08-15)This report describes the construction and installation of the Bjørnafjorden floating bridge. The bridge consists of a cable stay bridge in the south connected to a 4.5km long floating bridge. The south end of the ...