Browsing Statens vegvesens rapporter / NPRA reports by Author "Statens vegvesen"
Now showing items 1-20 of 44
-
Alternative K12 - Consolidated technical report
Statens vegvesen (Statens vegvesens rapporter;, Report, 2019-08-15)This report is a technical description of concept K12, and the work carried out up to assessment and final selection. The development of the concepts and the assessment and selection is described in separate reports. -
Design basis Bjørnafjorden
Statens vegvesen (Statens vegvesenss rapporter;, Report, 2018-11-19)A bridge will replace todays ferry connection between Halhjem and Sandvikvåg in Bjørnafjorden. The bridge will be a part of a larger project to make E39 continuous, without ferries, from Kristiansand to Trondheim. Replacing ... -
Design of cable stayed bridge
Statens vegvesen; HeSky (Statens vegvesens rapporter;, Report, 2019-08-15)The cable-stayed part of the Bjørnafjorden bridge is well within span-lengths of conventional cable-stayed bridges. Untraditional features as in-length inclination of the tower, and grouping of cables makes the design more ... -
Design of pontoons and columns
OHHK/DDS; Statens vegvesen (Statens vegvesens rapporter;, Report, 2019-08-15)Finite element models of two typical pontoon and column geometries have been developed. Both linear and non-linear finite element models are created. The ULS utilization and ALS utilization of both pontoon geometries ... -
Drepte i vegtrafikken: 1. kvartal 2016
Statens vegvesen (Statens vegvesens rapporter;532, Report, 2016-04-15)Denne rapporten sammenstiller opplysninger om drepte trafikanter per 1. kvartal 20161. Oversikten er basert på foreløpige tall fra SSB. Rapporten inkluderer også tall for skadde trafikanter og trafikkulykker, og sammenligner ... -
Fatigue assessment
Statens vegvesen (Statens vegvesens rapporter;, Report, 2019-08-15)The Bjørnafjorden floating bridge concept K12 (the project groups (OON) proposed concept; curved, end-anchored with mooring system) has been evaluated for fatigue life. This report includes calculations of fatigue life for ... -
Fremmede skadelige arter: Oppfølging av lovverk
Statens vegvesen (Statens vegvesens rapporter;387, Report, 2016-11-25)Rapporten beskriver hvordan Statens vegvesen følger opp lovverk om fremmede skadelige arter og om andre uønskede arter som planteskadegjørere. -
Independent Analyses of AMC Floating Bridge BJF 2019
Statens vegvesen (Statens vegvesens rapporter;, Report, 2019-11-28)Perform independent global analyses of AMC K12 concept -
Independent Analyses of OON Floating Bridge BJF 2019
Statens vegvesen (Statens vegvesens rapporter;, Report, 2019-11-28)Perform independent global analyses of OON K12 concept -
K11 - Feasibility study for damper between tower and bridge girder, phase I
Statens vegvesen (Statens vegvesens rapporter;, Report, 2020-04-27)This note describes the phase 1 of a feasibility study for a damper between tower and bridge girder. For this alternative K11 concept it is proposed to replace the girder-tower connection in K11_07, by two passive viscous ... -
K12 - Architectural design
Statens vegvesen (Statens vegvesens rapporter;, Report, 2019-08-15)This report describes our work on the architectural design of the floating bridge. Heyerdahl Architects AS has been engaged in earlier phases of the project "E39 Stord - Os" with a proposal for an end anchored floating ... -
K12 - Design of abutments
Statens vegvesen; TN/SGR/SAH (Statens vegvesens rapporter;, Report, 2019-08-15)Both abutments are founded on prepared bedrock base. The south location is on the island Reksteren and the north is located on the islet Gullholmane. The bridge box girder is monolithically connected to the abutments in ... -
K12 - Design of bridge girder
Statens vegvesen; JoS (Statens vegvesens rapporter;, Report, 2019-08-15)The report describes the design of the bridge girder with calculation of cross-section properties. There are two types of cross section along the bridge. Type 1 is used in the cable stayed bridge and in the lower part of ... -
K12 - Design of mooring and anchoring
Statens vegvesen; KWA/HSA TBO (Statens vegvesens rapporter;, Report, 2019-08-15)The current report summarizes the mooring system design proposed for the recommended Bjørnafjorden floating bridge concept K12. The concept is generally the same as proposed during the concept evaluation and can easily be ... -
K12 - Ship impact, Global assessment
Statens vegvesen; EivBj (Statens vegvesens rapporter;, Report, 2019-08-15)The global response of the bridge due to ship impact has been studied in this report. The main focus is impacts between ship deckhouse and girder and between ship bulb and pontoon. Girder impacts all along the bridge ... -
K12 - Ship impact, Pontoons and columns
Statens vegvesen; TNNgu (Statens vegvesens rapporter;, Report, 2019-08-15)The case of a ship impact on the K12 – end-anchored floating bridge with mooring system over Bjørnafjorden, is studied. The report seeks to clarify how the structure responds to ship impact locally on pontoons and columns ... -
K12 - Structural response analyses
Statens vegvesen; VBK (Statens vegvesens rapporter;, Report, 2019-08-15)In this reports a description of the applied loads are presented along with the limit states and requirement that have been applied in design. The limit state response is also presented together with the calculated ... -
K12 – Marine geotechnical design
Statens vegvesen; JOM/KNHBE/JOH (Statens vegvesens rapporter;, Report, 2019-08-15)This report describes the geotechnical design for the recommended bridge concept K12. The K12 concept is an end-anchored floating bridge with mooring system for increased robustness and redundancy. There is a pylon support ... -
K12 – Ship impact, Bridge girder
Statens vegvesen; TNNgu (Statens vegvesens rapporter;, Report, 2019-08-15)The case of a ship impact on the K12 – end-anchored floating bridge with mooring system over Bjørnafjorden, is studied. The report seeks to clarify how the structure responds to ship impact locally on the bridge girder ... -
K12 – Summary report
Statens vegvesen (Statens vegvesens rapporter;, Report, 2019-08-15)This report gives a summary of the K12 floating bridge concept developed.