Browsing Rapportserier / Reports by Subject "Geosynteter"
Now showing items 1-2 of 2
-
Armering av veg
(Intern rapport / Veglaboratoriet;1991, Research report, 1997) -
Long-term behaviour of a 13 m high reinforced steep soil slope. Paper presented at Euro Geo 1 Maastrict
(Intern rapport;1910, Research report, 1996-10)In the summer of 1993 a 13 m high reinforced soil slope was built in the City of Lillehammer as part of the new road system constructed in conncection with the 1994 winter olympic games. The reinforced soil slope with an ...