Browsing Statens vegvesen by Subject "SBJ-33-C5-AMC-22-RE-112"
Now showing items 1-1 of 1
-
Preferred solution, K12 - Appendix L – Design of cable stayed bridge and abutments
(Statens vegvesens rapporter;, Report, 2019-08-15)Introduction: The cable stayed bridge is constituting the south portion of the Bjørnafjorden Bridge, "cantilevering" from Reksteren across the Svarvahelleholmen Island and connecting to the floating bridge at axis 3. The ...