Blar i Brage - Statens vegvesen på emneord "Concept development, floating bridge"
Viser treff 1-2 av 2
-
Preferred solution, K12 - main report
(Statens vegvesens rapporter, Report, 2019-08-15)This report outlines the preferred solution for crossing of Bjørnafjorden for phase 5 of the E39 Bjørnafjorden project, performed by the AMC project group. Current version of this report is the final report issued for ... -
Preferred solution, K12 – Appendix O Material technology and steel in marine environment
(Statens vegvesens rapporter;304624, Report, 2019-08-15)The bridge design life is 100 years and this document discusses material selection and means of providing corrosion protection to limit the need for future inspections, maintenance, and replacements. The recommended solutions ...