Preferred solution, K12 - Appendix L – Design of cable stayed bridge and abutments
Report
Åpne
Permanent lenke
https://hdl.handle.net/11250/2660004Utgivelsesdato
2019-08-15Metadata
Vis full innførselSamlinger
Sammendrag
Introduction: The cable stayed bridge is constituting the south portion of the Bjørnafjorden Bridge, "cantilevering" from Reksteren across the Svarvahelleholmen Island and connecting to the floating bridge at axis 3. The tower is positioned on the island, while the 380 m main span allows the navigation to pass under at a height of 45 m and a width of 250 m or more.