• Fatigue assessment 

      Statens vegvesen (Statens vegvesens rapporter;, Report, 2019-08-15)
      The Bjørnafjorden floating bridge concept K12 (the project groups (OON) proposed concept; curved, end-anchored with mooring system) has been evaluated for fatigue life. This report includes calculations of fatigue life for ...
    • K12 - Architectural design 

      Statens vegvesen (Statens vegvesens rapporter;, Report, 2019-08-15)
      This report describes our work on the architectural design of the floating bridge. Heyerdahl Architects AS has been engaged in earlier phases of the project "E39 Stord - Os" with a proposal for an end anchored floating ...
    • K12 - Design of bridge girder 

      Statens vegvesen; JoS (Statens vegvesens rapporter;, Report, 2019-08-15)
      The report describes the design of the bridge girder with calculation of cross-section properties. There are two types of cross section along the bridge. Type 1 is used in the cable stayed bridge and in the lower part of ...
    • K12 - Ship impact, Global assessment 

      Statens vegvesen; EivBj (Statens vegvesens rapporter;, Report, 2019-08-15)
      The global response of the bridge due to ship impact has been studied in this report. The main focus is impacts between ship deckhouse and girder and between ship bulb and pontoon. Girder impacts all along the bridge ...
    • K12 - Structural response analyses 

      Statens vegvesen; VBK (Statens vegvesens rapporter;, Report, 2019-08-15)
      In this reports a description of the applied loads are presented along with the limit states and requirement that have been applied in design. The limit state response is also presented together with the calculated ...