Verification Summary Report E39 Bjørnafjorden
Report
Permanent lenke
https://hdl.handle.net/11250/2676885Utgivelsesdato
2020-06-26Metadata
Vis full innførselSamlinger
Sammendrag
With basis in a 4-year (2016 – 2020) Frame Agreement (FA) with Statens vegvesen, Region vest (SVV) DNV GL has performed a high number of verifications, control and advisory activities related to the E39 fjord-crossing project between Trondheim and Kristiansand. This has been an evolution with evaluations and analyses of many floating bridge alternatives. Main focus has been on the 5 km record long Bjørnafjorden (BJF) crossing, hence BJF is the focus in this report per advice from SVV.